110 Aerospace Drive Hangar Modifications

W&J Construction was the original contractor for this hangar which was completed in 2014. The Melbourne Airport Authority is upgrading the hangar to support a fire deluge system for an incoming tenant. The project will consist of a partial demolition to the existing floor slab, addition of a trench drain system and the installation of the foam fire deluge system.

110 Aerospace Dr. Melbourne, FL 32901

General Gallery