North Cargo Berth 5 Upland Improvements

W&J was General Contractor for the Canaveral Port Authority on the Upland Improvements to North Cargo Berth 5 located at the Port. Scope of work included: constructing 2.4 acres of asphalt pavement directly behind the NCB5 bulkhead wall; trench drains; drainage pipes and structures; a wet detention pond; potable water main and services; fire hydrants and associated earthwork activities.

9157 Grouper Road, Port Canaveral, FL 32920

Aerial Gallery


General Gallery